Operational Impact

30%

Operational Efficiency Improvement

26 Days

Time Saved

USD 300M

Cost Savings

150 KPIs

Live Performance Tracking

Value Delivered

Event Summary

A leading Asian operator struggled to complete wells within planned timelines despite adequate rig capability. Performance gaps were driven by recurring non-productive time (NPT) and invisible lost time (ILT) across multiple sections.

With automated ILT and Total Impact detection, the operator was able to:

VuMaxPro, detailed performance analysis revealed that a significant portion of operational time was consumed by unnecessary and inefficient procedures—previously hidden in traditional reporting.

Well Details

Location

Asia – Land

Well Type

Directional

We’re heading to ATCE 2026 in Houston!

Discover how we’re making drilling data smarter, faster, and easier to visualize. Whether it’s real-time analytics, performance dashboards, or AI-powered insights