From data to decisions - demonstrated in the field. Optimizing performance with engineering-driven analytics.
VuMaxPro identified inefficient connection practices through automated rig state analytics, exposing hidden time loss in the 12.25” section. Corrective actions reduced NPT and improved overall drilling efficiency across wells.
A U.S. operator was experiencing persistent performance challenges, including low rate of penetration (ROP), inconsistent drilling practices, and extended section drilling times.
A leading Asian operator was struggling to complete wells within planned timelines. Despite adequate rig capability, performance lagged due to recurring Non-Productive Time (NPT) and Invisible Lost Time (ILT) across multiple hole sections.
A U.S. operator was experiencing inconsistent ROP and recurring flowback issues while drilling an 12.25″ section in a challenging formation. Using VuMaxPro advanced flowback fingerprinting algorithms and customized alarm framework, a potential kick event was identified nearly three hours before it could escalate.
Discover how we’re making drilling data smarter, faster, and easier to visualize. Whether it’s real-time analytics, performance dashboards, or AI-powered insights