A U.S. operator was experiencing excessive non-productive time (NPT) during well construction due to inefficient drilling practices.
Offset well analysis revealed a consistent pattern: reaming and back-reaming were performed at every connection, despite no hole stability issues. This unnecessary activity added significant rig time and cost per well.
By deploying VuMaxPro’s real-time data integration with 29 rig states, the operator was able to: